Bundaberg Port Gas Pipeline, Zinfra

In 2015 CNC Project Management was engaged by Zinfra to produce an International Erosion Control Association (IECA)-compliant Erosion and Sediment Control Plan (ESCP) for the Bundaberg Port Gas Pipeline.

CNC’s Certified Practitioners in Erosion and Sediment Control (CPESCs) were able to complete the ESCP for the 28 km, DN100 high pressure steel pipeline. The pipeline, constructed by Zinfra on behalf of operator APA Group, provides the Bundaberg Port development area with a connection to the existing gas network.

CNC was able to deliver the ESCP in a timely and efficient manner, identifying all reasonable and practicable measures necessary to minimise short- and long-term soil erosion and the adverse effects of sediment transport on surrounding landscapes and water quality values.

Engaging CPESCs in a project’s approvals process enables proponents and contractors to be IECA-compliant and is now legally required by some projects.